Then cover it all up
Well it’s now time to cover the roof, first we have a felt which is seen from the inside.
Then we have insulation to add, in this case its the last three years wool sheared from our own sheep.
Then over the centre we put a disc of plywood so the soil won’t put pressure directly between the spars of the secondary reciprocal frame.
Then more wool and an old duvet cover over the tops of the rafters to avoid any direct pressure against the water-proof cover.
A few extra dumpy bags cut up to fill in a few gaps still open.
Then the water-proof cover.
Chris bond with the soil.
The end of the day.
The end of the next day all the turf we removed from the build site is now on the roof along with a little more from the next site and the Sedums planted.
You must be logged in to post a comment.